Grand Harbour · Residential

Harbour Point Residence

Size
4,800 sq ft
Year
2021
Role
General contractor
Wind
Cat 5 / 200 mph
Location
Grand Harbour

The challenge

Soft fill across most of the plot and a canal edge that had to carry a private dock. The ground as found would not take the loads.

The solution

Excavated and replaced the fill, then a piled edge beam along the canal to carry the dock independently of the house slab. Marine-grade concrete specified throughout for the waterline elements.

The result

Handed over four weeks inside the contract programme. No settlement recorded at the canal edge since completion.

More work

All projects

South Sound

Palm Heights Villas

Three villas on one plot, taken from a sketch through planning to keys.

YEAR 2024 ROLE Design and build

South Sound

Coral Ridge House

Three-level family home on an exposed South Sound shoreline, 40 m from the tide line.

YEAR 2023 ROLE General contractor