Skip to content
AAA CONSTRUCTION Request a quote

West Bay Road · Construction Management

Earth Close Retail Centre

Size
22,400 sq ft
Year
2022
Role
Construction management
Wind
Cat 5 / 200 mph
Location
West Bay Road

The challenge

The owner held their own architect and engineer and needed a single point of accountability across eleven tenant fit-outs, each on a different lease date.

The solution

Took the programme, the trades and the site under construction management. Ran one works schedule against eleven separate handover dates and carried the planning and inspection process for each unit.

The result

All eleven units released for fit-out on their contracted dates. The owner retained the same arrangement for the second phase.